Go Back : Home

Free Trial Issue of Entrepreneur magazine 

Photos of the renovation of the Honest Alley Exchange! P11

9/17 - drywall has been installed in my space - it's not finished yet but coming along fast!
More drywall
My new walls and office door!
Inside my storage/office area. Yes, it's small, but it's actually bigger than I thought it would be and all that is needed.
The city is doing some work on the water main to allow us to tap into it.
The fronts of the larger retail storefronts have been painted
Most of the drywall is now in - they are beginning to install the HVAC. This duct will be exposed and I think I'm going to paint it dark purple!
More work done on the HVAC today - still a little more to do but I would imagine this will be complete on 9/21.
The HVAC unit inside the mechanical closet.
The drywall in most of the unit has been finished and sanded really smooth. I've never seen so much dust in all my life!!!!!! There is still some drywall that needs to be installed inside my closet before we can paint. We have to wait for the plumbing to be installed before we can get the next inspection and close up the walls.
The metal steps that end right in front of my space were installed. They still need to complete the rails and the landing but this is a big thing to get behind us!
More concrete was poured for the front today.
Framing for some additional concrete to be poured behind the steps. I believe there will be more stonework added in the curve behind the steps.

 Page 1 Page 2  Page 3  Page 4  Page 5  Page 6  Page 7  Page 8  Page 9  Page 10   Page 11  Page 12   Page 13  Page 14  Page 15

 

 
Google

Great Links

More Links

Link Exchange

My Oh My Shops

www.JewelryDirectory.org

   ©2007 Sparkle Whenever Possible, Inc. dba Sparkle!     All Rights Reserved  
Acceptance Mark

Help